Add On/Remodel

Berryville, Texas

This job was an add on in which we took the previous master bath and turned it into a full walk in closet with laundry.  The new bath room was an 8'x18' add on.  This project took 6 weeks to complete.

Custom Deck Build

Whitehouse, Texas

Here we built a front and back deck.  Both were tied into existing roof to match house.  Project took approximately 2 weeks to complete.

Custom Shower Remodel

Lindale, Texas

We removed a fiberglass tub and surround and replaced it with a rolled steel tub and ceramic tile surround.  In the Master bathroom we tore out the drop in shower and installed a custom ceramic tile shower with double pivot glass doors.